New Zealand Rail Maps: NZRM Progress Report 2023-11-25: Volume 6

Work on maps recently has been focused on Volume 6. In the 1960s the NIMT between Porirua and Plimmerton was doubled, electrified and realigned. Whilst mapping has been done on this section before, it needed to be redone to make it easier to overlap the mosaics produced from Wellington to Porirua which are in a

 Read More 


Posted

in

,

by

Tags: