Since the field testing on August 5th and the subsequent report on map formats for future testing, no substantial work of any nature has been done on the maps. There has been a small change in the GPS files that are available for download from the Volume 7 page. The full set of GPS locations Read More
New Zealand Rail Maps: NZRM Progress Report 2023-08-13: Midland Line
by
Tags: